一级卖婬片A片AAAA鲁大师,少妇精品无码一区二区免费视频,亚洲无码视频在线观看,国产黄色在线观看

Preparation work before production of kneading machine and sewing agent production equipment

2025-03-29 11:03:20 1

The kneading machine and sewing agent production equipment are ideal machines for pre molding, mixing, vulcanization, and re healing of low viscosity, elastoplastic raw materials. The kneading machine and sewing agent production equipment can be used to produce and manufacture silicone, sealants, hot melt adhesives, food adhesives, pharmaceutical and traditional Chinese medicine preparations, etc. The kneading machine and sewing agent production equipment are unique mixing and stirring machines. It is common to use two ∑ blades and parallel circular tangent differential sorting, where one blade has a faster speed and the other has a slower speed, which is conducive to causing shear stress. Different blade speeds promote the quick cutting of the raw materials of the mixed rubber, thereby enabling the raw materials to be mixed evenly.


1. After equipment installation, carry out cleaning, decontamination, and scrubbing of rust resistant plant oils and fats. Inspect each lubrication point and introduce lubricating grease.


2. Before driving, check the tension level of the V-belt and adjust the anchor bolts to move the motor to an appropriate position.


3. Check whether the standard parts are loose, whether the steam pipeline is leaking, and whether the power circuit and electrical equipment are safe. The electric heating kneading machine must have a grounding system.


4. Clean and tidy the pre molding room before debugging. Perform 10-15 minutes of aviation component rotation, confirm that the equipment is operating normally before adding materials for production and manufacturing. Generally, the transmission gear (including reducer) of a new mobile phone produces a lot of noise during the initial application, which will naturally decrease after a period of time when it is in and out.


5. When using steam heating, valves and pressure gauges should be installed at the inlet of the steam pipeline, and the working pressure of the steam should not exceed the specified working pressure for the mixing tank indicated on the label.


6. When pre shaping the mixing paddle, it is necessary to reduce the application flipping.


麻豆美女丝袜人妻中文 | 人妻久久久一区二区三区 | 国产精品久久久久久亚洲色欲 | 国产在线无码观看 | 国产欧美婬乱一区二区 | 特黄无码人妻丰满少妇啪啪 | 国产伦精品一区二区三区妓女下载 | 国产真实乱婬A片三区高 | 亚洲国产成人精品无码区6080 | 手机午夜福利100 | 人与禽一级婬片A片老牛 | 99re国产口爆吞精 | 黄色小视频在线免费观看 | 可以在线观看的免费的污视频 | 国产一级特黄a高潮片 | haodiaocao的视频这里看 | 熟女人妻 人妻の视频 | 欧美夜间激情成人在线观看 | 国产一级a爱做片免费☆观看 | 9人妻偷拍 熟女网站 | 成人国产精品秘 鲁鲁3D | 亚洲一区二区在线老片 | 黄色一区二区三区四区 | 免费观看做爰视频ⅩXX午夜 | 按摩BBWBBWBBW视频 | 久久久国产精品黄毛片喷水 | 免费日本在线小视频 | 无码人妻一区二区三区免费京洛会 | 久久天天躁狠狠躁夜夜AV | 国产黄色视频在线播放 | 美女口交吞精视频 | 亚洲视频高清无码在线观看 | 蜜臀AV999无码精品国产专区 | 亚洲在线视频观看 | 亚洲AV成人片一区二区 | 国产AV无码片毛片一级久老师 | 内射少妇39亚洲区 | 真人啪啪试看120秒 国产农村新婚一级A片 | 亚洲精品久久久久久久久久久 | 午夜理理伦电影A片无码残囡 | 婬乱的妇女HD中文字幕 |